Stratos Industrial AI
Underground mine tunnel illuminated by blue and cyan lighting
The Video-Verified Work Movement

Talk is cheap.
Video is undisputed.

Manual reports, Excel graveyards, and offline tablets are how operations ran in 2015. Stratos evolves your site to video-verified work — every shift, every heading, every cycle captured automatically and traceable back to the footage that proves it.

2015 operations

Your site still runs on talk.

A typical underground shift contains 12–18 delay events. A supervisor recalls 4–6 of them. Operators overstate productive time by 18–25%. The cause is structural: human recall degrades after twelve hours underground — and nothing on the site tests it.

Manual shift reports— written from memory
Excel graveyards— no one opens them
Offline tablets— sync once a shift, if at all

Work assigned verbally

No record that it was received. Status checked by radio — 8 to 12 calls per shift, interrupting both supervisor and operator every time.

3–4 hours walking headings

Supervisors physically walk headings every two to three hours. Between rounds, a 45-minute loader delay at 10:50 is unknown until the 13:00 check.

Hazards announced on the radio

Written on a whiteboard at the portal. Crew underground may never hear it. There is no proof anyone was notified.

Report written from memory

After 12 hours underground, the supervisor writes the end-of-shift report in 45 minutes. It misses most of what happened.

Every one of those steps is a data-capture failure, and every one of them compounds. The decision cycle from site event to executive response is two weeks minimum.

It's time to get serious about accountability.

The way forward

Welcome to the
video-verified work movement.

The sites that evolve will set the new standard for accountability. The ones that don't will explain themselves against footage they never collected.

Video-verified work

The way forward is video-verified work.

Talk is cheap. Video is undeniable. Stratos replaces memory with observation, assembly with generation, and the radio with push — running on observed, verified data with a chain of custody.

Pillar 1

Continuous observation

Traditional mining reporting is a memory exercise. Stratos cameras observe continuously. Nothing is omitted because it was forgotten.

"The camera watches the machine. The record it creates is as likely to be in your favour as against you."

Pillar 2

Every number with proof

Every AI classification links to the video clip that generated it. Every number carries a confidence score. Low-confidence events are flagged for human review.

"Every number comes with a proof of work."

Pillar 3

Evidence both sides trust

Stratos observes independently of the contractor's own reporting. Disputes resolve on data. The data usually exonerates the crew.

"The improvement lives in logistics, equipment wait times, and dispatch gaps."

Proof of concept

One sport replaced talk with video. The lessons transfer underground.

Major League Baseball umpires were the most accurate they had ever been in 2025 — and every wrong call stood as final. In 2026, video made every call testable in 14 seconds. Three lessons emerged that map directly onto a mine site.

Most reversed

Most experienced performed the worst

Decades behind the plate without an objective feedback loop produced conviction, not accuracy. When every call became testable, the most senior umpires were overturned most often. Experience without evidence is a liability.

52%

52% of players stopped lying about their height

The moment a listed number carried consequences, 225 of 430 players revised their height downward in a single off-season. No policy was written. Nobody was disciplined. Accountability arrived the instant the record could be tested.

31%

Ejections fell 31%

In 2025, 110 of 174 ejections came from a manager arguing a call face-to-face. In 2026, ejections fell 31%. The dispute moved from the field to the record. This is the lesson mining needs most: the fear of conflict is what lets underperformance hide. Supervisors avoid the hard conversation; contractors defend every delay. When the footage carries the argument, no one has to fight in person — and the truth lands without a fight.

Heavy industry carries higher consequences than any sport — and has no review mechanism at all. Video-verified work closes that gap.

See the full ABS evidence

The product

Plan vs actuals, continuously.

Stratos overlays your plan against observed reality in real time. The gap between what was scheduled and what actually happened — visible to the minute, traceable to the footage that proves it. No more waiting for the end-of-shift report to learn the plan slipped at 10:50.

Plan vs actuals to the minute — every activity, every delay.
The gap between scheduled and observed, visible continuously.
Live on web and mobile, at the face and in the boardroom.
Stratos Plan vs Actuals dashboard with live mobile activity status

By the numbers

Ground truth for every shift, every heading, every cycle.

225+

AI layers across four tiers

21

deliverables produced

10

workflows captured

12

stakeholder roles served

Proof of work — measured product capability

100%

of delays captured and classified

vs. 4–6 of 12–18 recalled manually

time studies per year

replacing a $40–80K study every 3–5 years

<90s

from hazard to all stakeholders notified

vs. 6–8 hours

<60s

from issue to site-wide broadcast

vs. 1–3 days

What video-verified work does

Stratos activates video-verified work — and triggers the paperwork for you.

When the camera sees a cycle complete, a delay start, or a defect, Stratos auto-generates the work order, the form, the report, and the time study — each linked to the footage that proves it. And when your crew enters a work order by hand, Stratos enhances it automatically with timestamps, location, and observed context.

Work orders

A detected cycle completion, delay, or defect opens a work order automatically — linked to the footage.

Forms & reports

Shift closeouts, hazard records, and supervisor roll-ups generated from observed activity, not memory.

Time studies

A continuous, infinite time study runs in the background — every cycle, every heading, automatically.

Stratos Forms module — new submissions, in progress, and submitted forms
Stratos dashboards — plan vs actuals, feed, and delay analyzer

Worker-entered work orders are enhanced automatically — Stratos attaches the observed timestamp, the location, and the surrounding activity context the moment the crew hits submit.

Who it's for

Stratos serves the entire org chart —
from the operator at the face to the client's board.

An independent, timestamped record of contractor performance against KPIs. No information asymmetry. Performance disputes resolved on data. KPI scorecards benchmarked against anonymised industry data.

A client-facing live dashboard with no information asymmetry. KPI performance tracked against contract terms continuously. Underperformance surfaces in real time. The single strongest argument for mandating Stratos across your contractors.

Every delay captured with a timestamp accurate to 60 seconds and AI-classified into 25+ sub-categories. True availability and utilisation calculated automatically. Recurring root causes surfaced — the same delay stops recurring.

Cycle times timed to the minute from actual observation. The bottleneck located at the activity level. Mine plan targets updated with verified actual data, replacing guesswork with confidence intervals.

Stratos is a protection mechanism for the crew. When delays happen, the data shows whether the cause was mine-side or contractor-side. Disputes get resolved on evidence. The data defends your crew far more often than it criticises them.

From signed to value

Three steps. One week to your first verified shift.

No months-long implementation. No dedicated infrastructure build. Stratos runs on the cameras already on your site, and the filtration layer absorbs the complexity automatically.

01

1–3 meetings to onboard

A new project starts with one to three working sessions. We map your headings, your workflows, and your KPIs. No lengthy procurement or scoping exercise.

02

1 day installation

A technical specialist brings the site online in a single day, working from cameras already on site. No mounting programme, no survey rig, no dedicated network.

03

Value from week 1

Clients start yielding value in the first week. First spatial data in hand, first delay patterns visible, first work orders verified against footage.

1–3 meetings to onboard. 1 day to install. Week 1 to your first verified shift.

Stratos Planner and mobile schedule — always online at the face
Always online

No more paperwork locked underground.

Stratos tablets stay online anywhere on site — including headings with no network. No more waiting until shift change for digital paperwork trapped in an offline tablet. Forms, work orders, and hazard reports sync from the face in real time.

Contact us to find out how we accomplish always-on connectivity anywhere on site.

Book a demo

Become accountable.
Or be left behind.

90 days. Two KPIs. The footage does the talking. You define the metrics, we baseline them in four weeks, and at the end you have a number.

Book a demo