Tunnelling & Civil Works
Advance rates measured to the minute.
From TBM drives to drill-and-blast headings, Stratos records every advance, every support cycle, and every logistics delay, giving project teams an objective daily record of the drive.
Book a demoTo the min
advance rate and cycle timing
100%
of support installs verified
<90s
from hazard to every stakeholder
Available time to productive time
Every stoppage on the drive, classified to the minute.
TBM utilisation sets the advance rate. Stratos splits each shift into boring, ring build, grouting, and maintenance, then attributes every stoppage to muck logistics, segment supply, or cutterhead work.
- 01 Project plan
- 02 Verified segments
- 03 Reporting KPIs
Project plan · one 12 h shift
planned activities
0%
TBM utilisation
0 m
Advance per day
0 min
Average ring build
0
Stoppages classified
Where the lost time went
Plan adherence by phase
Advance in metres per day
Illustrative shift based on modelled site data. Every figure is captured, analyzed, and reported in seconds, with the video that proves it.
Stratos in action
Video-verified work for tunnelling & civil works
01
Advance rate tracking
TBM and drill-and-blast advance measured continuously, with every stoppage classified.
02
Ground support QA
Bolting, mesh, and shotcrete installation recorded as verified, auditable sign-offs.
03
Segment and muck logistics
Supply and removal delays measured so the drive runs at its true constraint.
04
Confined space safety
Entry, exit, and hazard events recorded and broadcast to the whole project team.
Solutions applied
Become accountable.
Or be left behind.
90 days. Two KPIs. The footage does the talking. You define the metrics, we baseline them in four weeks, and at the end you have a number.