Stratos Industrial AI
Industries

Tunnelling & Civil Works

Advance rates measured to the minute.

From TBM drives to drill-and-blast headings, Stratos records every advance, every support cycle, and every logistics delay, giving project teams an objective daily record of the drive.

Book a demo

To the min

advance rate and cycle timing

100%

of support installs verified

<90s

from hazard to every stakeholder

Available time to productive time

Every stoppage on the drive, classified to the minute.

TBM utilisation sets the advance rate. Stratos splits each shift into boring, ring build, grouting, and maintenance, then attributes every stoppage to muck logistics, segment supply, or cutterhead work.

  1. 01 Project plan
  2. 02 Verified segments
  3. 03 Reporting KPIs

Project plan · one 12 h shift

planned activities

Shift change
Boring
Ring build
Grout & survey
Maintenance
Shift changeBoringRing buildGrout & surveyMaintenance

0%

TBM utilisation

0 m

Advance per day

0 min

Average ring build

0

Stoppages classified

Where the lost time went

Plan adherence by phase

Advance in metres per day

Illustrative shift based on modelled site data. Every figure is captured, analyzed, and reported in seconds, with the video that proves it.

Stratos in action

Video-verified work for tunnelling & civil works

01

Advance rate tracking

TBM and drill-and-blast advance measured continuously, with every stoppage classified.

02

Ground support QA

Bolting, mesh, and shotcrete installation recorded as verified, auditable sign-offs.

03

Segment and muck logistics

Supply and removal delays measured so the drive runs at its true constraint.

04

Confined space safety

Entry, exit, and hazard events recorded and broadcast to the whole project team.

Become accountable.
Or be left behind.

90 days. Two KPIs. The footage does the talking. You define the metrics, we baseline them in four weeks, and at the end you have a number.

Book a demo