Live in one shift. Verified data in week one. Your workflows, unchanged.
Stratos ingests your project plan and round designs, instruments the site with machine vision, and measures every activity against the plan to the second. It runs standalone from day one, and it slots into the scheduling, reporting, forms and compliance workflows you already have.
Start with a footage trial100%
of deployments live inside one shift
Day 1
server, cameras and AI training
Weeks 1–2
dashboards live and reporting
Day 3
recoverable gap already visible
How Stratos works
Any camera in. Work orders, forms, sign-offs, and compliance out.
Stratos doesn't digitise the report. It replaces the observer. Any camera becomes an input: fixed sensors, bay cams, yard cams, drones, satellites. The output is not an alert or a dashboard. The output is the work.
Any camera in
Fixed sensors, bay cams, yard cams, drones, satellites. No retrofit, no new hardware to buy. If it records video, it's an input.
Stratos AI classifies
49 AI layers that turn footage into structured work data, automatically, with no human input: activity classification, delay detection, cycle timing, true OEE.
The work comes out
Work orders, forms, sign-offs, cycle times, compliance packs. Each linked to the footage that proves it. Not an alert. The work itself.
Work orders
Accurate to the second, with footage attached
Forms & sign-offs
Pre-starts, inspections, QC — auto-populated
Cycle times
Continuous time study, every unit, every shift
Compliance packs
Safety and reporting tied to what the site did
From the Face to Space
One system, every layer of the mine, one undisputed source of truth.
How fast
One day to install. Value in week one. Not a multi-year transformation.
1–3
meetings to onboard
1 day
to install
Week 1
value, not months
From signed to value
Five steps from first meeting to a verified shift.
No procurement marathon, no infrastructure programme, no autonomy project. Stratos runs on cameras at the heading, on ramps, in shafts and in yards, connected to an on-site server that feeds the platform 24/7.
2 wks before
Pre-deploy
Forms, schedule, round designs, KPIs and report templates loaded. Camera locations scoped with your team.
Day 1 · one shift
Install & calibrate
Server, cameras and network installed and calibrated to the site inside a single shift. Capture begins.
Days 1–3
Train the AI
Vision models trained on your faces, your fleet, your material and your cycles. Not a generic dataset.
Continuous
Capture & monitor
Every required activity captured as it happens, attributed to a named person, timestamped to the second.
Weeks 1–2
Report & review
Dashboards live. Shift and round reports auto-populated, reviewed weekly with your dedicated analyst.
2 wks to prepare. 1 shift to install. Weeks 1–2 to dashboards and reports.
From signed to value
Three steps. One week to your first verified shift.
No months-long implementation. No dedicated infrastructure build. Stratos runs on the cameras already on your site, and the filtration layer absorbs the complexity automatically.
1–3 meetings to onboard
A new project starts with one to three working sessions. We map your headings, your workflows, and your KPIs. No lengthy procurement or scoping exercise.
1 day installation
A technical specialist brings the site online in a single day, working from cameras already on site. No mounting programme, no survey rig, no dedicated network.
Value from week 1
Clients start yielding value in the first week. First spatial data in hand, first delay patterns visible, first work orders verified against footage.
1–3 meetings to onboard. 1 day to install. Week 1 to your first verified shift.
Granularity in seconds
From available time to full analysis in seconds.
Stratos breaks every shift into its true components. Delays, pauses, and reworked events are captured, analyzed, reported, and backed by video within seconds.
Available time · one 12 h shift
every second accounted for
Productive time
71%
Delays
14 events
Pauses
9 events
Reworked events
3 events
Captured
Every delay, pause, and reworked event detected as it happens.
Classified
AI assigns the cause, the equipment, the crew, and the location.
Analyzed
Duration, cost, and impact on plan calculated against available time.
Reported
Supervisors and managers receive the event on web and mobile.
Video-backed
Every event links to the exact clip that proves it.
How we drive impact
Baseline honestly, find the constraint, prove the uplift from evidence.
Weeks one to four establish an honest baseline in five domains. From then on the gap to target is visible every shift, improvement initiatives are scoped from the baseline, and every gain is tracked against it. The 15-to-30-minute repeating delays a daily report never records get detected, attributed and fixed before they compound into lost rounds.
Plan conformance & advance
Of everything the round plan calls for (drill, charge, blast, muck, support, services), the fraction executed to plan, by heading and by round, with a projected completion date against each milestone.
Availability & utilization
The gap between ready and working. A fleet can be highly available and poorly utilized, and the difference sits in queues.
Loading & payload
How full the bucket and the truck are: visual fill, under, target or over. Underloading is a silent, expensive loss.
Workforce & time
Effective working time. Shift-start loss runs 30 to 60 minutes on a remote camp site, recoverable once it is measured.
Compliance & reporting
Safety and compliance workflows completed, documented and audit-ready, with report start and completion times against plan.
The cadence
One record, four rhythms, from the face to the program office.
Every shift
Short interval control
The supervisor acts on delays and plan conformance before the next shift starts.
Daily
Score and conformance
The accountability score, plan conformance and payload reviewed against the round plan.
Weekly
Performance review
A working session with your dedicated Stratos analyst: trends, patterns and the constraint to fix next.
Program review
The business case
The program office draws on the same record for uplift against baseline and the business case.
Standalone or integrated
Stratos works alone on day one and integrates as deep as you want it to.
The verified record is the same in every configuration. What changes is how much of your existing stack reads from it. Move along the spectrum whenever the program is ready, without redeploying.
No connection to any existing system required.
Vision only
Stratos runs entirely on its own.
Cameras go in, the AI trains on your site, and the platform generates the record without touching a single existing system. Nothing to migrate, nothing to re-key, no dependency on your IT roadmap. This is how every deployment starts.
What you get
- Auto-generated work orders
- Cycle analysis and infinite time studies
- Delay analyzer with attributed causes
- Auto shift and round reports
- Safety and compliance metrics from footage
- Accountability score, video-verified
Always reporting
Standalone or integrated, the reporting is always there.
Every engagement includes auto-generated reports across seven time horizons, from a single cycle to a full year. Each one is built from what the cameras saw, not what someone wrote down, and each one covers anything from a single aspect of the workflow to the entire operation.
Source
Every report is auto-generated from the vision platform.
Scope
Anything from a single aspect to the entire workflow.
Inside your workflows
Your plan goes in. The finished work comes out.
Stratos does not ask the site to adopt a new way of working. It takes the schedule, the forms and the reports the project already runs on, then fills them from what the cameras saw.
Scheduling
What goes in
Your development schedule, round designs and KPI definitions, keyed by your team or imported straight from planning software.
What comes out
Work orders pre-populated by heading and activity, crews assigned through the shift scheduler, plan vs actuals to the minute.
Zero
duplicate data entry
Reporting
What goes in
The report templates the program already uses, mapped to your reporting framework during pre-deploy.
What comes out
Shift and round reports auto-populated from vision data, exportable in the program's own format, with playback attached.
2.4 hrs/day
supervisor and crew time recovered
Forms
What goes in
Your pre-starts, hazard cards, workplace examinations, inspections and shift closeouts, digitised as-is.
What comes out
Forms served to the right person and enforced before work proceeds, each tied to a named person and a timestamp.
To the second
supervisor sign-off captured
Compliance
What goes in
The regulatory and internal framework the program answers to, plus the audit and export requirements.
What comes out
An audit-ready record of what was required, done and approved, with report start and completion times against plan.
One record
owner, contractor and program office

No more paperwork locked underground.
Stratos tablets stay online anywhere on site — including headings with no network. No more waiting until shift change for digital paperwork trapped in an offline tablet. Forms, work orders, and hazard reports sync from the face in real time.
Contact us to find out how we accomplish always-on connectivity anywhere on site.
Proof of concept
Send us your footage. We will time study it before you commit to anything.
You do not have to take the platform on faith. Send video from your own site and we will analyze it, classify the activities and produce a time study from it as a proof of concept. No cameras to install, no site access, no disruption. You see Stratos read your operation before a single decision is made.
Every engagement is structured the same way: if the data does not demonstrate measurable progress against the agreed baseline, you are under no obligation to continue. The data makes the decision.
01
You send footage
Any existing video from your site: fixed cameras, bay cams, yard cams, a drone pass, even a phone recording of a heading or a bay.
02
We analyze and time study it
Our team trains models on your footage and runs a full time study: activities classified, cycles timed, delays attributed to the minute.
03
You get the read-out
Every number linked back to the clip that produced it, so you can check the analysis against what the camera actually saw.
What we need from you
Eight inputs. That is the whole ask.
Stratos supplies the cameras, the server, the AI training, the cyber-security and a dedicated analyst. Onboarding is included, users are unlimited, and preparation starts two weeks before go-live so Day 1 is an install rather than a discovery exercise.
Project schedule & round designs
The development plan and round plans, so work orders pre-populate by heading and activity.
KPI definitions & milestone dates
What to measure, and the critical-path dates to protect against.
Forms & reports to digitise
Pre-starts, hazard cards, inspections and the program's reporting templates.
Site & area access
The active headings, portal and laydown areas, and access to camera locations.
A server location
One office area with standard power and internet. Regular speed is fine.
Network & physical install
Existing comms or PoE / fiber, and a certified site crew to run cabling and mount cameras.
An IT point of contact
To confirm power, data and any system or database connections.
Safety onboarding
Site induction for the Stratos deployment team.

