Construction & Infrastructure
Progress you can replay. Claims you can prove.
Stratos turns site cameras into a daily, verified record of progress against schedule. Owners, general contractors, and subcontractors work from the same footage-backed source of truth.
Book a demoDaily
progress verified against schedule
100%
of reported hours tied to footage
<1 shift
to install Stratos cameras
Available time to productive time
10 hours on site. 6.2 hours of direct work, verified.
Direct work rate decides whether a schedule holds. Stratos measures every trade's available hours against the look-ahead plan and exposes the permit waits, trade stacking, late deliveries, and rework that push milestones.
- 01 Project plan
- 02 Verified segments
- 03 Reporting KPIs
Project plan · one 10 h site day
planned activities
0%
Direct work rate
0%
Planned percent complete
0.0 d
Schedule slip recovered
0
Delays with video evidence
Where the lost time went
Plan adherence by phase
Direct work hours per crew day
Illustrative shift based on modelled site data. Every figure is captured, analyzed, and reported in seconds, with the video that proves it.
Stratos in action
Video-verified work for construction & infrastructure
01
Plan vs actuals
Scheduled activities compared against observed work continuously, with slippage visible the hour it starts.
02
Subcontractor productivity
Crew hours, trade stacking, and idle time measured and attributed by contractor.
03
Claims and change order evidence
Delay and disruption claims backed by timestamped video, resolving disputes on data.
04
Site safety and PPE
PPE compliance and exclusion zone events recorded with a complete chain of custody.
Solutions applied
Become accountable.
Or be left behind.
90 days. Two KPIs. The footage does the talking. You define the metrics, we baseline them in four weeks, and at the end you have a number.