Less time in the field.
Every second of the work verified.
Stratos runs 24/7 across critical infrastructure maintenance, capturing, analyzing, and tracking every task against the project plan, all remotely, while reducing human exposure.
Book a demoThe core thesis
Reduce exposure by letting Stratos watch the work, 24/7.
In nuclear maintenance, time in the field is dose. Stratos keeps eyes on every critical task around the clock, so people enter only when the work needs their hands.
01
Every minute off the floor is dose avoided
Stratos observes the work continuously, so walkdowns, progress checks, and hold point witnessing happen from a remote control room.
02
ALARA, measured
Time in radiological areas is captured per worker, per task, per shift, giving radiation protection teams verified data to plan the next job with less exposure.
03
Fewer entries, shorter stays
Tooling, material, and crew readiness are confirmed on video before anyone dresses in, so every entry is productive from the first minute.
Remote supervision
Supervisors outside the facility. Full command of the work.
Video verified work gives supervisors a live, evidence-backed view of every work face. Oversight stays complete while their dose drops toward zero.
- Supervisors oversee multiple work faces from outside the protected area
- Hold points and QA witness steps verified on timestamped video
- Progress tracked live against the outage schedule, hour by hour
- Shift turnovers run from footage, with every open item on the record
- Contractor hours and scope matched against observed work
- Every event linked to the clip that proves it, ready for regulatory review
Hands off, fully remote
Capture, manage, analyze, and track progress against the project plan.
Capture
Any camera becomes an input: fixed, radiation-tolerant, robotic, or body-worn. Stratos watches 24/7.
Manage
Work packages, hold points, and crew assignments tracked against the plan in one live view.
Analyze
AI classifies every delay, pause, and rework event in seconds, with cause, crew, and location.
Track
Plan against actuals for every unit, every shift, every critical path activity, reported remotely.
Available time to productive time
Every hour in the field counts as dose. Stratos makes each one productive.
In outage and refurbishment work, available time is shaped by dress-in, transit, and radiation protection coverage. Stratos verifies each shift from briefing to dress-out and isolates the hold point waits, staging gaps, and rework that extend both schedule and exposure.
- 01 Project plan
- 02 Verified segments
- 03 Reporting KPIs
Project plan · one 12 h outage shift
planned activities
0%
Less supervisor field time
0%
Hold points verified on video
0/7
Remote coverage
0
Delays classified
Where the lost time went
Plan adherence by phase
Supervisor field hours per shift
Illustrative shift based on modelled site data. Every figure is captured, analyzed, and reported in seconds, with the video that proves it.
Proposed deployment · Bruce B, Units 5 to 8
Bruce Power: video verified outage and refurbishment maintenance.
Bruce Power operates eight CANDU units at its site in Tiverton, Ontario, and is extending the life of Units 3 to 8 through its Major Component Replacement program alongside planned maintenance outages. Bruce Power is actively evaluating machine vision for maintenance, operational efficiency, and process improvement. This case study models a Stratos deployment across Units 5 to 8.
Optimize performance
Every critical path activity measured against the outage schedule, so slippage is visible the hour it starts.
Reduce human exposure
Supervision, walkdowns, and witness points moved to a remote control room, cutting person-hours in radiological areas.
Streamline efficiency
Waits on tooling, permits, radiation protection coverage, and hold points classified and costed automatically.
Improve the process
Verified footage of each repeated task becomes the benchmark and training standard for the next unit.
38%
Modelled reduction in supervisor field time
24/7
Remote coverage of every work area
100%
Hold points backed by video
4 units
One benchmark carried unit to unit
Modelled figures for a proposed deployment. Final outcomes are baselined with the site team during the pilot.
Become accountable.
Or be left behind.
90 days. Two KPIs. The footage does the talking. You define the metrics, we baseline them in four weeks, and at the end you have a number.