Manufacturing & Assembly
Every station, every cycle, every unit.
Stratos runs a continuous time study across the line. Station cycle times, bottlenecks, and defects are measured on every unit and linked to the footage that explains them.
Book a demoContinuous
time study on every station
Every
defect linked to its clip
15 min
to train a new AI model
Available time to productive time
Every station minute becomes measured OEE.
Planned production time is the denominator of OEE. Stratos times every unit at every station against takt and separates the late starts, micro-stops, changeover overruns, starved stations, and rework that sit between planned and actual output.
- 01 Project plan
- 02 Verified segments
- 03 Reporting KPIs
Project plan · one 8 h shift
planned activities
0%
OEE
0 s
Cycle time vs 55 s takt
0.0%
First pass yield
0
Micro-stops captured
Where the lost time went
Plan adherence by phase
OEE by week, in percent
Illustrative shift based on modelled site data. Every figure is captured, analyzed, and reported in seconds, with the video that proves it.
Stratos in action
Video-verified work for manufacturing & assembly
01
Station cycle time
Every unit timed at every station, replacing periodic manual time studies.
02
Line balancing
Bottlenecks and starved stations identified from observed flow, shift by shift.
03
Quality traceability
Defects linked to the exact clip where they occurred, accelerating root cause.
04
Workforce training
Best-practice footage becomes the training standard for every new operator.
Solutions applied
Become accountable.
Or be left behind.
90 days. Two KPIs. The footage does the talking. You define the metrics, we baseline them in four weeks, and at the end you have a number.
