Stratos Industrial AI
Industries

Manufacturing & Assembly

Every station, every cycle, every unit.

Stratos runs a continuous time study across the line. Station cycle times, bottlenecks, and defects are measured on every unit and linked to the footage that explains them.

Book a demo

Continuous

time study on every station

Every

defect linked to its clip

15 min

to train a new AI model

Available time to productive time

Every station minute becomes measured OEE.

Planned production time is the denominator of OEE. Stratos times every unit at every station against takt and separates the late starts, micro-stops, changeover overruns, starved stations, and rework that sit between planned and actual output.

  1. 01 Project plan
  2. 02 Verified segments
  3. 03 Reporting KPIs

Project plan · one 8 h shift

planned activities

Start-up
Run A
Changeover
Run B
Quality check
Start-upRun AChangeoverRun BQuality check

0%

OEE

0 s

Cycle time vs 55 s takt

0.0%

First pass yield

0

Micro-stops captured

Where the lost time went

Plan adherence by phase

OEE by week, in percent

Illustrative shift based on modelled site data. Every figure is captured, analyzed, and reported in seconds, with the video that proves it.

Stratos in action

Video-verified work for manufacturing & assembly

01

Station cycle time

Every unit timed at every station, replacing periodic manual time studies.

02

Line balancing

Bottlenecks and starved stations identified from observed flow, shift by shift.

03

Quality traceability

Defects linked to the exact clip where they occurred, accelerating root cause.

04

Workforce training

Best-practice footage becomes the training standard for every new operator.

Become accountable.
Or be left behind.

90 days. Two KPIs. The footage does the talking. You define the metrics, we baseline them in four weeks, and at the end you have a number.

Book a demo