Underground Mining
Every round, every bucket, every heading on the record.
Stratos watches the face, the haulage drifts, and the shops continuously. Delays, cycle times, and hazards are classified by AI and pushed to supervisors in seconds, each one linked to the footage that proves it.
Book a demo100%
of delays captured and classified
<90s
from hazard to every stakeholder
<1 shift
to install Stratos cameras
Available time to productive time
12 available hours. 7.6 hours of verified work at the face.
Face time is the constraint on every heading. Stratos converts each shift's available hours into verified face time and shows the exact minutes lost to late re-entry, loader queues, and ventilation clearance.
- 01 Project plan
- 02 Verified segments
- 03 Reporting KPIs
Project plan · one 12 h shift
planned activities
0%
Face utilisation
0.0 m
Advance per round
0.0 h
Round cycle time
0
Delays classified
Where the lost time went
Plan adherence by phase
Verified face hours per shift
Illustrative shift based on modelled site data. Every figure is captured, analyzed, and reported in seconds, with the video that proves it.
Stratos in action
Video-verified work for underground mining
01
Face cycle verification
Drill, blast, muck, and bolt, each stage timestamped so every round has a verified start and finish.
02
Haulage and loader productivity
Every bucket counted, every queue measured, every wait time attributed to its true cause.
03
Hazard broadcast
A detected hazard reaches every crew, supervisor, and manager in under 90 seconds, with proof of notification.
04
Contractor verification
Metres advanced and hours billed are matched against observed work, so invoices carry evidence.
Solutions applied
Become accountable.
Or be left behind.
90 days. Two KPIs. The footage does the talking. You define the metrics, we baseline them in four weeks, and at the end you have a number.