Stratos Industrial AI
Industries

Nuclear Infrastructure Maintenance

Less time in the field. Every task verified.

Stratos runs 24/7 across outages and refurbishment projects, capturing and analyzing every workflow remotely so supervisors and crews spend less time in radiological areas.

Book a demo

24/7

remote coverage of every work area

100%

of hold points backed by video

38%

modelled cut in supervisor field time

Available time to productive time

Every hour in the field counts as dose. Stratos makes each one productive.

In outage and refurbishment work, available time is shaped by dress-in, transit, and radiation protection coverage. Stratos verifies each shift from briefing to dress-out and isolates the hold point waits, staging gaps, and rework that extend both schedule and exposure.

  1. 01 Project plan
  2. 02 Verified segments
  3. 03 Reporting KPIs

Project plan · one 12 h outage shift

planned activities

Briefing & dress-in
Transit
Channel & feeder work
Inspection & hold points
Waste & logistics
Dress-out & survey
Briefing & dress-inTransitChannel & feeder workInspection & hold pointsWaste & logisticsDress-out & survey

0%

Less supervisor field time

0%

Hold points verified on video

0/7

Remote coverage

0

Delays classified

Where the lost time went

Plan adherence by phase

Supervisor field hours per shift

Illustrative shift based on modelled site data. Every figure is captured, analyzed, and reported in seconds, with the video that proves it.

Stratos in action

Video-verified work for nuclear infrastructure maintenance

01

Exposure reduction

Walkdowns, progress checks, and witness points run from a remote control room, lowering person-hours in the field.

02

Outage schedule tracking

Critical path activities measured against the outage plan hour by hour, with slippage flagged as it starts.

03

Hold point and QA verification

Every inspection and sign-off backed by timestamped footage, ready for regulatory review.

04

Unit to unit improvement

Verified footage of each repeated task becomes the benchmark and training standard for the next unit.

Become accountable.
Or be left behind.

90 days. Two KPIs. The footage does the talking. You define the metrics, we baseline them in four weeks, and at the end you have a number.

Book a demo